Which of the following is NOT true of an MRP record?

A) The current time is the beginning of the first period.
B) The immediate or most current period is called the action bucket.
C) The projected on-hand balance is for the end of the period.
D) An item is considered to be available at the end of the time bucket in which it is required.
E) The number of periods in the record is called the planning horizon.

D