During eXtreme Programming:

A) system requirements are produced during the systems analysis phase.
B) system specifications are created during the design phase.
C) coding and testing are done at the beginning of the implementation phase.
D) system requirements, system specifications, and coding and testing activities are combined into a single analysis-design-code-test process.
E) none of the above are correct.

D
Explanation: D) Design specifications are captured as part of the design process itself, evolving with each iteration through the cycle of analysis-design-code-test.