Give examples of schedules at the SNAPSHOT isolation that are

a. Serializable and hence correct.
b. Nonserializable and incorrect.

a. r1(x) r1(y) r2(y) r2(z ) w1(x) w2(z) is serializable in either order.
b. r1(x) r1(y) r2(x) r2(y) w1(y) w2(x) is not serializable. T1 and T2 read the same snapshot, but since they write different data items, they are both allowed to commit.

Computer Science & Information Technology

You might also like to view...

The presence of additional and disruptive signals in network communications or electrical power delivery is referred to as _________________________.

Fill in the blank(s) with the appropriate word(s).

Computer Science & Information Technology

What is the major component that is required in order to implement a basic VMware Horizon Virtual Desktop Infrastructure?

A. A functional VMware ESXi cluster. B. A Horizon services controller. C. A storage area network (SAN). D. The connection server.

Computer Science & Information Technology