He set the analysis aside for a few days and had forgotten about it completely until one night when his frequent dining companion Leonid Hurwicz visited his house and retired to the drawing room for an apertif

"What you must do, my friend," Hurwicz began, "is to declare your coefficient of optimism, which can be tricky." After forty-five minutes of intense concentration, the cold, calculating father decided that his coefficient of optimism was 0.5. "Wait a minute Hurwicz, that figure sounds as if I'm afraid of making a decision," the father intoned. "It seems that depending on how optimistic I am, the optimal choice changes between alternative B and alternative D. Furthermore, another transition point exists between alternatives C and D. What is this devilry, Hurwicz?"
Help Leonid Hurwicz identify the range of coefficients of optimism that render alternatives, B, C, and D superior to all others.

The cold, calculating father did exactly that when examining the 27 year old failure to launch man child that had turned his walk in closet into a bedroom. As he saw it, there were five alternatives; each had its advantages and disadvantages, and under different circumstances, each had a different financial incentive. He laid it all out neatly in a table, but as not to arouse suspicion, he left the table's labels very generic, so the alternatives were simply labeled A through E while the different circumstances were simply numbered one through three. He flicked the gray ash off of his favorite purple smoking jacket and pondered the best course of action under each possible future. It was good to be devious, he decided.

One Two Three
A 19 6 20
B 26 5 48
C 24 18 17
D 43 34 15
E 36 34 15

Answer: A coefficient of optimism from 0 up to 0.096 would make alternative C most attractive.
A coefficient of optimism from 0.096 up to 0.666 would make alternative D most attractive.
A coefficient of optimism beyond 0.666 would make alternative B most attractive.

Business

You might also like to view...

What is TCP?

a) Transmission Control Protocol b) Technical Control Protocol c) Transmission Communication Protocol d) none of the above

Business

A project consists of eleven activities (all times are given in days) and has worker requirements as indicated in the table. Assume that all four workers employed by this organization are generalists

What schedule is attainable if the number of workers is not an issue? What is the fastest the project can be completed while constrained by the four worker limitation? Activity Activity time Workers Needed Predecessor A 10 1 B 4 2 C 7 3 A D 4 1 A E 8 2 B F 9 3 C,E G 13 1 D H 14 2 E,G J 13 3 F K 10 1 H, J L 5 2 K