A prime example of an internal failure cost is the:

A) labor cost associated with inspecting every item produced.
B) labor cost associated with repairing an item returned under warranty.
C) material cost of a piece of stock metal that has had too large a hole drilled in it.
D) material cost of the paint applied to the case of a finished unit.

C