When using a time study approach, the standard time is the:
A) normal time per cycle multiplied by 1.0 plus the allowance.
B) select time multiplied by the rating factor, summed over all work elements.
C) select time plus z times the standard deviation.
D) normal time plus z times the standard deviation.
A