Answer the following statement(s) true (T) or false (F)
1. Underground basins require additional measures to control pollution.
2. Off-site detention is intended to protect land in the immediate vicinity of the site from the effects of development.
3. A basin designed to have a permanent pond at the bottom is called a dry basin.
4. The primary goal of on-site detention is to reduce the peak rate of runoff leaving the site to a level equal to or less than the predevelopment peak rate.
5. Topographic conditions peculiar to individual sites have no bearing on the approach to detention design.
1. T
2. F
3. F
4. T
5. F