A PERT/CPM activity has an optimistic time estimate of 4 days, a most likely time estimate of 6 days, and a pessimistic time estimate of 10 days. The expected time (in days) of this activity is:
A) 6.0.
B) 6.33.
C) 7.0.
D) 7.5.
Answer: B