A VMware vSphere 6.x Administrator has been tasked with enabling the Integrated Load Balancer for the new vRealize Log Insight cluster. What three options are required before the Integrated Load Balancer can be used? (Choose three.)
A. The time on the vRealize Log Insight virtual appliance must be synchronized with an NTP server.
B. All vRealize Log Insight nodes are configured as the same size.
C. The vRealize Log Insight master and work nodes must have CA signed certificates.
D. Verify that all vRealize Log Insight nodes and the specified Integrated Load Balancer IP address are on the same network.
E. The vRealize Log Insight master and worker nodes must have the same certificates.
Answer:
A. The time on the vRealize Log Insight virtual appliance must be synchronized with an NTP server.
D. Verify that all vRealize Log Insight nodes and the specified Integrated Load Balancer IP address are on the same network.
E. The vRealize Log Insight master and worker nodes must have the same certificates.
You might also like to view...
Which of the following sets of acronyms is concerned with encoding data for secure transmission?
a. WAN, LAN b. VPN, NIC c. IPsec, SSH d. NAT, SSL
When previewing a document in the New Document dialog box, you have the option of opening the template as a new document or as a new template that can be modified
Indicate whether the statement is true or false