Brandon's computer shop has hired a consultant to help apply operations management techniques to increase profits. Currently the shop sells most of its computers to a high-end customized online retailer and sales are steady at 250 per month

A single work cell produces the computers. To produce the computer, three operations are required. First the parts must be assembled, next software must be installed, and finally the computer must be safely packed and labeled for shipping. These operations take 2 hours, 5 hours, and 1 hour respectively. If there are 6 available work hours each day and the shop operates 20 days per month find:
(a) the takt time, and
(b) the number of workers Brandon should hire.

(a) Takt time = (6 hours/day ? 20 days/month)/(250 units/month) = .48 hours per computer (or 28.8 minutes)
(b) Total operation time = 2 + 5 + 1 = 8 hours. Workers required = operation time / takt time = 8/.48 = 16.67 = 17 workers required

Business

You might also like to view...

Which of the following statements about the branding guidelines for a small business is true?

A) A small business must creatively conduct low-cost marketing research. B) A small business must avoid leveraging secondary brand associations. C) A small business must separate the well-integrated brand elements to enhance both brand awareness and brand image. D) A small business must disintegrate the brand elements to maximize the contribution of each of the three main sets of brand equity drivers. E) A small business must focus on building more than two strong brands based on a number of associations.

Business

Which of the following does the covenant of seisin promise?

A) The grantor owns the interest that he or she is conveying. B) The grantor controls an easement in the property he or she is conveying. C) The grantor owns a conditional estate in the land. D) The grantor has complied with all CC&Rs.

Business