Use the information from Table 5.3. What is the upper control limit (UCL) if the bank were to use z = 2 and a sample size of 100?
A) less than or equal to 0.02
B) greater than 0.02 but less than or equal to 0.04
C) greater than 0.04 but less than or equal to 0.06
D) greater than 0.06
C
Business
You might also like to view...
Cycle time should always be between the longest task time and the total task time in a production line.
A. True B. False
Business
Three properties are each valued at 120,000. The first property has a loan of 95,000, the second has a loan of 60,000, and the third has no liens. The property with the highest leverage is the
A) one with no liens. B) the one with the 60,000 loan. C) the one with the 95,000 loan. D) both properties with loans
Business