Which of these is not an objective of designing output?
A) Provide appropriate output distribution.
B) Choose the most effective output method.
C) Design output to serve a specific purpose.
D) Provide the output on time.
E) Sell the user on current forms.
E
Business
You might also like to view...
A waiting line meeting the assumptions of M/M/1 has an average time between arrivals of 20 minutes, and it services items in an average of 10 minutes each. What is the utilization factor?
A) 0.25 B) 0.33 C) 0.50 D) 0.67 E) 3.00
Business
Use the information in Table H.3. What is the normal time for work element 2?
A) fewer than 10 seconds B) greater than or equal to 10 seconds but fewer than 11 seconds C) greater than or equal to 11 seconds but fewer than 12 seconds D) greater than or equal to 12 seconds