Which of the following statements about hoselines during overhaul operations is MOST accurate?

a. Hoselines should be monitored for leakage, especially at couplings.
b. Floor runners protect hoselines from damage by debris.
c. 3½ inch (90 mm) attack lines must be present during overhaul.
d. All couplings should be positioned in the middle of the salvage site.

Answer: c. 3½ inch (90 mm) attack lines must be present during overhaul.

Health Professions

You might also like to view...

Code for the removal of a tumor on the temporal bone

A) 69950 B) 69955 C) 69960 D) 69970

Health Professions

Arriving at the scene, Shayla recognizes the presence of hazardous materials. What should Shayla do?

A) Enter the area and rescue victims. B) Determine the hazard. C) Request specialized resources. D) Begin immediate treatment of those affected.

Health Professions