The forward rate is calculated from all the following observable data items EXCEPT:
A) the forecast of the future spot exchange rate
B) the home currency deposit rate
C) the foreign currency deposit rate
D) the spot exchange rate
Answer: A
You might also like to view...
Consider the assembly line below. The three fabrication operations run in parallel, such that each batch of 20 units only needs to go through one of the three fabrication operations
After that, each batch needs to go through both assembly operations, which occur simultaneously (specifically, 10 components are made for each unit in the fabrication stage—some components are then assembled in the Assembly 1 area while others are assembled in the Assembly 2 area). The units are packaged and made ready for shipment in the final stage. What is the throughput time per batch of this operation? A) 88 min. B) 8 min. C) 40 min. D) 34 min. E) 33 min.
Transferring data from a legacy system to the new system would be defined by which category of system design specifications?
A) input B) database C) manual procedures D) conversion E) implementation