What will be an ideal response?
total deposits
In the above figure, the slope across the arc between b and d is
A) 1/2. B) 1/3. C) 5/3. D) 6/5.
In the above table, if the marginal factor cost is $20, how many workers would be hired?
A) 3 B) 4 C) 5 D) 6