Research has shown that, in general:
A) There is a tendency to underestimate activity lengths.
B) There is a tendency to overestimate activity lengths.
C) The activity lengths are estimated correctly.
D) The activity lengths are estimated correctly but the networks are drawn incorrectly.
B
You might also like to view...
What is par value? Can a corporation legally issue no-par stock?
What will be an ideal response?
Three jobs are to be assigned to three machines. Cost for each job-machine combination appears in the table below
Perform the first two steps of the assignment method (subtract the smallest number in each row and subtract the smallest number in each column; then cover with straight lines). At this point in the problem-solving process: Machine A Machine B Machine C Job 1 11 14 6 Job 2 8 10 11 Job 3 9 12 7 A) the row for Job 1 contains the values 5, 6, and 0. B) calculations are complete, and the problem is ready for an optimal set of assignments. C) the column for Machine B indicates that it should be retired. D) Job 1 should be performed on Machine B. E) Job 1 should be performed on Machine A.