Counter-controlled iteration requires
a. A control variable and initial value.
b. A control variable increment (or decrement).
c. A condition that tests for the final value of the control variable.
d. All of the above.
d. All of the above.
You might also like to view...
A special output device designed to produce large high-quality graphics such as maps and architectural drawings is called a plotter.
a. true b. false
A. A standard entitled "Standard for Software Test Documentation" B. A standard entitled "Recommended Practice for Software Requirements Specifications" C. A standard entitled "Software and systems engineering--Software testing" D. A standard entitled "Systems and software engineering--Architecture description" E. The course of actions used to identify, understand, and resolve problems that occur during software development F. Activities associated with converting an architectural design into a level of abstraction that can be coded and tested G. The process of testing software components in combination to ensure that functional and qualitative software requirements have been satisfied H. The process of testing developed software to ensure that the requirements have been met I. The process of testing documented software requirements to ensure that they have been met J. Testing to ensure that developed software provides intended functionality at a high level of quality