If a periodic process in the on-board train protection system is used to collect data from the trackside transmitter, how often must it be scheduled to ensure that the system is guaranteed to collect information from the transmitter? Explain how you arrived at your answer.

What will be an ideal response?

If a periodic process in the on-board train protection system is used to
collect data from the trackside transmitter, how often must it be scheduled
to ensure that the system is guaranteed to collect information from the
transmitter? Explain how you arrived at your answer.To estimate the period of the process for trackside information collection, we must
be able to ensure that the process will always be scheduled during the period can
access the trackside information and collect information before it passes out of
range of the transmitter. Here we use the maximum train speed (50 m/sec), the
transmission time (50 ms) and the fact that the train must be within 10 m of the
transmitter before it can collect information.
Simplistically, the train is within 10 m of a transmitter for 400 ms assuming
that the distance between the train and the transmitter is negligible. It takes 50 ms
to collect the information so collection must start within 350 ms of entering a
segment. Therefore, if the process collecting data from the transmitter is scheduled
3 times/second, it ought to always be able to collect transmitter data.

Computer Science & Information Technology

You might also like to view...

Word uses wordwrap, so if a word does not fit at the end of a line, what happens to that word?

A) It is automatically moved to the next line B) It is automatically hyphenated C) Nothing D) It depends if the word has more than two syllables

Computer Science & Information Technology

____ is especially effective for type, because you can use it to create classic effects like raised text and chiseled text.

A. Drop Shadow B. Bevel and Emboss C. Feathered Stroke D. Gloss Contours

Computer Science & Information Technology