The loss caused by deviation from the target standard is $15.47 per unit and the Taguchi constant for the material is 247. What is the mean squared deviation (V) from the desired target value?
A) (4.00)2
B) (7.50)2
C) (0.13)2
D) (3.67)2
E) (0.25)2
E